Open Access System for Information Sharing

Login Library

 

Conference
Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads
Full metadata record
Files in This Item:
There are no files associated with this item.
DC FieldValueLanguage
dc.contributor.authorHong, J.-
dc.contributor.authorMoon, K.-
dc.contributor.authorLee, K.-
dc.contributor.authorLee, K.-
dc.date.accessioned2021-12-03T02:05:11Z-
dc.date.available2021-12-03T02:05:11Z-
dc.date.created2021-11-30-
dc.date.issued2021-09-05-
dc.identifier.issn1868-4238-
dc.identifier.urihttps://oasis.postech.ac.kr/handle/2014.oak/107789-
dc.description.abstractThe steelmaking-continuous casting (SCC) is a bottleneck process in the steel production. Due to elevated product variety and environmental restrictions on the steelmaking industry, efficient operation of the SCC has become more crucial. This paper considers an SCC scheduling problem to minimize the weighted sum of total waiting time, total earliness, and total tardiness while satisfying the maximum waiting time and the continuous casting constraints. We propose a generic mixed integer linear programming (MILP) model that can express various SCC scheduling requirements. Using the MILP model, we develop an iterated greedy matheuristic inspired by the iterated greedy method. An initial SCC schedule is constructed by solving small MILP models one after another. Then, it is improved by solving a series of small MILP models representing the destruction and construction of the prior schedule. Through a numerical experiment, we show that the proposed algorithm can obtain efficient solutions in a short time and outperforms an NSGA-II algorithm for most test cases of practical size. ? 2021, IFIP International Federation for Information Processing.-
dc.languageEnglish-
dc.publisherSpringer Science and Business Media Deutschland GmbH-
dc.relation.isPartOfInternational Conference on Advances in Production Management Systems-
dc.relation.isPartOfIFIP Advances in Information and Communication Technology-
dc.titleAn Iterated Greedy Matheuristic for Scheduling in Steelmaking-Continuous Casting Process-
dc.typeConference-
dc.type.rimsCONF-
dc.identifier.bibliographicCitationInternational Conference on Advances in Production Management Systems, pp.62 - 72-
dc.citation.conferenceDate2021-09-05-
dc.citation.conferencePlaceFR-
dc.citation.conferencePlaceNantes, France-
dc.citation.endPage72-
dc.citation.startPage62-
dc.citation.titleInternational Conference on Advances in Production Management Systems-
dc.contributor.affiliatedAuthorHong, J.-
dc.contributor.affiliatedAuthorMoon, K.-
dc.contributor.affiliatedAuthorLee, K.-
dc.contributor.affiliatedAuthorLee, K.-
dc.identifier.scopusid2-s2.0-85115252014-
dc.description.journalClass1-
dc.description.journalClass1-

qr_code

  • mendeley

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher

이강복LEE, KANGBOK
Dept. of Industrial & Management Eng.
Read more

Views & Downloads

Browse