A Process Monitoring Scheme Controlling False Discovery Rate
SCIE
SCOPUS
- Title
- A Process Monitoring Scheme Controlling False Discovery Rate
- Authors
- Sang-Ho Lee; Jun, CH
- Date Issued
- 2012-11-01
- Publisher
- Taylor & Francis
- Abstract
- A new process monitoring scheme is proposed by using the Storey procedure for controlling the positive false discovery rate in multiple testing. For the 2-span control scheme, it is shown numerically that the proposed method performs better than X-bar chart in terms of the average run length. Some simulations are accomplished to evaluate the performance of the proposed scheme in terms of the average run length and the conditional expected delay. The results are compared with those of the existing monitoring schemes including the X-bar chart. The false discovery rate is also estimated and compared with the target control level.
- Keywords
- Average run length; Conditional expected delay; False discovery rate; X-bar chart; HEALTH
- URI
- https://oasis.postech.ac.kr/handle/2014.oak/15732
- DOI
- 10.1080/03610918.2011.625483
- ISSN
- 0361-0918
- Article Type
- Article
- Citation
- Communications in Statistics-Simulation and Computation, vol. 41, no. 10, page. 1912 - 1920, 2012-11-01
- Files in This Item:
- There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.