Open Access System for Information Sharing

Login Library

 

Article
Cited 4 time in webofscience Cited 5 time in scopus
Metadata Downloads

Scheduling of raw-material unloading from ships at a steelworks SCIE SCOPUS

Title
Scheduling of raw-material unloading from ships at a steelworks
Authors
Kim, BIChang, SYChang, JHan, YKoo, JLim, KShin, JJeong, SKwak, W
Date Issued
2011-01
Publisher
TAYLOR & FRANCIS LTD
Abstract
Formulating a schedule for unloading raw material from ships at the seaport of a steelworks is a difficult task. Even in its simplest possible form, finding an optimum solution for the problem is nondeterministic polynomial time (NP)-hard. The problem at a steelworks gets more complicated due to several factors, such as the difference in capacities of unloading equipment, the requirement of keeping ships balanced and the dynamic nature of berthing eligibility of each ship, as governed by the weight of the remaining payload. Moreover, the raw material must be transported through a network of belt conveyor units to designated storage yards while being discharged from ships. The combinatorial nature of this belt conveyor operation is analysed in this article. A heuristic approach to the raw-material unloading problem is proposed and its effectiveness was tested with real-world examples.
Keywords
transportation; seaport scheduling; steelworks; berth; unloader; BERTH-ALLOCATION PROBLEM; DOCK ARRANGEMENT; CONTAINER PORT; OPERATIONS; SEARCH; MODELS; SYSTEM
URI
https://oasis.postech.ac.kr/handle/2014.oak/17334
DOI
10.1080/09537287.2010.488923
ISSN
0953-7287
Article Type
Article
Citation
PRODUCTION PLANNING & CONTROL, vol. 22, no. 4, page. 389 - 402, 2011-01
Files in This Item:
There are no files associated with this item.

qr_code

  • mendeley

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Views & Downloads

Browse