Open Access System for Information Sharing

Login Library

 

Thesis
Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads
Full metadata record
Files in This Item:
There are no files associated with this item.
DC FieldValueLanguage
dc.contributor.author이상온en_US
dc.date.accessioned2014-12-01T11:49:14Z-
dc.date.available2014-12-01T11:49:14Z-
dc.date.issued2014en_US
dc.identifier.otherOAK-2014-01677en_US
dc.identifier.urihttp://postech.dcollection.net/jsp/common/DcLoOrgPer.jsp?sItemId=000001676682en_US
dc.identifier.urihttps://oasis.postech.ac.kr/handle/2014.oak/2179-
dc.descriptionMasteren_US
dc.description.abstractThe global steel market is currently suffering from price drop caused by China’s active and excessive supply of steel for common use, and further by the price rise of raw materials. A survival strategy of Korea for properly coping with such a global market situation would be to increase the production of high quality steels. Of high quality steels, particularly electrical steel is very important because China is not able to produce it easily. For the production of electrical steel, ferrosilicon is used as an additive to prepare the magnetic Si component. Ferrosilicon can be classified into high purity ferrosilicon and semi-high purity ferrosilicon according to the contents of impurities, such as Ca and Ti. In the case of high Fe-Si, domestic steel industry depends highly on import from China, and accordingly on its production in China, and therefore is facing high risks that might be caused by China’s policy changes(environmental regulation, export duties, etc.). For this reason, a domestic manufacturer established and is currently operating a plant at Ocheon-eup, Pohang-si, with an annual production goal of 35,500 tons. This research carried out a reverse engineering of the ferrosilicon plant to prepare its I/O diagram, function diagram, operation diagram and PFD, the originals of which must have been prepared at the time of designing the plant for the first time. In addition, relevant mass balance and energy balance were prepared using Aspen Plus and Excel, and research was also conducted on equipment design. Further, an effort was made to design not only a plant that adopts the process method of the established plant, but also various plants that adopt different process methods, to compare economy between them.en_US
dc.languagekoren_US
dc.publisher포항공과대학교en_US
dc.rightsBY_NC_NDen_US
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/2.0/kren_US
dc.titleFerrosilicon Plant를 예로 한 공정설계 방법en_US
dc.title.alternativeProcess Design Methods Based on a Ferrosilicon Planten_US
dc.typeThesisen_US
dc.contributor.college일반대학원 엔지니어링특성화협동과정en_US
dc.date.degree2014- 2en_US
dc.contributor.department포항공과대학교en_US
dc.type.docTypeThesis-

qr_code

  • mendeley

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Views & Downloads

Browse